Student Built House
FOREST LAKE AREA SCHOOL DISTRICT 831
STUDENT BUILT HOUSE
BASE BUILDING SPECIFICATIONS FOR CONSTRUCTION TRADES HOUSE AND BIDDER INFORMATION
House is inspected by the MN Department of Labor and Industry 3 times per year
HOUSE TO BE BUILT BASED ON ATTACHED PLANS
EXTERIOR SPECIFICATION:
Base Size: 26' x 52' RAMBLER, Clear Span Floor Trusses, 2x6 Exterior Walls, R-21 Fiberglass Wall Insulation, 4/12 Pitch Roof with Energy Heel, R-38 Blown Fiberglass Ceiling Insulation, Sliding Vinyl Windows, 2 - 36" Entrance Doors, 1 - 6’ x 7’ Sliding Patio Door, 30 Year Architectural Asphalt Shingles, Aluminum Soffit/Fascia, Double 4” Vinyl Siding
INTERIOR SPECIFICATIONS:
2 x 4 Framed Interior Walls, ½” Sheetrock on Walls Finished Smooth, ⅝ Sheetrock on Ceilings Textured Knockdown, All Drywall Taping Done Professionally, Walls and Ceiling will be Primed but Unpainted, Unfinished Floor, NO Plumbing Fixtures Except Shower/Tub, 3 Bedrooms with Closets, Primed MDF Interior Doors, Primed MDF Casing, Primed MDF Base Trim, 2 Full Bathrooms, White Kitchen Cabinets with Laminate Countertops, White Bathroom Vanities with Laminate Countertops.
MECHANICALS:
All mechanicals are through the floor for service and hook up.
- Hot water heater NOT included
- Heating and air conditioning units/ducting NOT included
- Electrical overseen by licensed electrician and wired to code
- Plumbing overseen by licensed plumber
- Lighting fixtures are NOT included
SUCCESSFUL BIDDER IS RESPONSIBLE FOR:
- Painting and painting related supplies.
- Removal of the house within 30 days after the school year ends or incur a $100.00 per day fee after the 30 days.
- All costs associated with the removal and moving of the house.
- Assumes all responsibility once removed from foundation.
- All mechanicals that will service the house.
- May request modifications to base specifications upon which adjustments will be calculated and added to the bid price.
- Insurance at transfer of ownership or June 30, 2027, whichever is sooner (covered by the School District until then)
- Down payment required: $10,000 certified check, payable upon notice of successful bid.
- Down payment is non-refundable should the bidder withdraw anytime between this bid award and house completion.
- Making the remaining payment on or before June 30, 2027.
**Any unknown cost increases of materials will be borne by the buyer**
Forest Lake Area Schools reserves the right to reject any or all bids and to waive any informalities within.
BID DUE: June 4, 2026, at 10:00 AM
Minimum Bid: $89,000, plus sales tax
Please submit completed bid form in sealed envelope to:
Forest Lake Area Schools
Chrissy Rehnberg-Eide/House Bid
6100 210th Street North
Forest Lake, MN 55025